Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the loginizer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wavesene/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the pods domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/wavesene/public_html/wp-includes/functions.php on line 6114
Ballast Water Treatment System (UV) – 3Waves Energy Pte Ltd

Category : ,

Ballast Water Treatment System (UV)

Technical Characteristics

Treatment Capacity from 100 to 1000 m3/h +
Power Supply 380 – 440V; 50-60 Hz; 3-phase
Power Requirement per UV reactor 14 to 22 kW depending on water quality
Environmental Operating Conditions T°= 0°C – 55°C; H% = 90
Global Head Loss < 0,5 bar
Min Operating Pressure 1 bar
Max Operating Pressure 10 bars
BIO-SEA secure ballasting, deballasting and cleaning operation with an association of filtration and UV water treatment. The choice between different sizes and designs of filter facilitates retrofit as well as new building installations. The modularity of the UV solution, treating 100 m3/h of brackish sea water per reactor, meets any pump’s flow rate.
Scroll to Top